Category: Recover

  • Onslow College

    Onslow College

    Over a span of two years, Onslow College underwent a transformative process as the RL Ultratherm Xtreme Recover system was applied to numerous classrooms. Opting for the RL Recover system stemmed from its capability to repurpose the existing roofing profile, thereby minimising disruptions within the internal classroom spaces. This approach not only sped up the…

  • Long Bay College – Blocks A & C

    Long Bay College – Blocks A & C

    Long Bay College, situated in Torbay on Auckland’s North Shore in New Zealand, is a secondary school with a decile 10 rating, catering to students in Years 9 through 13. As part of a remediation effort, RoofLogic Recover with FiberTite membrane was applied over the existing roofing iron. The installation process for the Recover with…

  • Douglas Park School – Admin Block

    Douglas Park School – Admin Block

    Douglas Park School is a primary school in Masterton. The Admin Block had weathertightness issues and needed to be repaired. The re-roofing project featured RoofLogics’ Recover system with FiberTite membrane over two distinct roof types. On one type, Recover Ultratherm Xtreme was applied over the existing profiled metal roof, with Tapered PIR boards to re-pitch…

  • Weta Digital

    Weta Digital

    Weta Digital chose RoofLogic for a Recover solution during the conversion of a warehouse into a high-tech creative workspace. A large central glazed atrium and mezzanine floor was added to the existing single level warehouse. Due to limited ceiling height, necessary thermal and acoustic enhancements were introduced above purlin height, not within the existing building.…

  • Museum of Transport and Technology

    Museum of Transport and Technology

    MOTAT (Museum of Transport and Technology) is New Zealand’s largest transport and technology museum and offers a fun and exciting learning experience for all ages. This project involved re-roofing a building at MOTAT and creating a warm roof in the process. The existing 2010 square meter metal roof had severe leaks. The process included securing…

  • Woolyarns

    Woolyarns