Within two years of opening, this large Distribution Centre in Christchurch faced weathertightness issues, prompting the application of the RL Recover system. Covering 20,000m² of existing roofing, the system used FiberTite membrane for its exceptional durability. RL Engineers carefully designed the RL Ultratherm Xtreme Recover system to ensure structural stability, providing a comprehensive solution to the initial weathertightness concerns faced by the building.